0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Nordhordlandsbrua
Beginning of works: 1991
Completion: 22. September 1994
Status: in use

Project Type

Structure: Pontoon bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge

Location

Location: , ,
, ,
Connects to: Nordhordland Cable-Stayed Bridge (1994)
Coordinates: 60° 31' 26.67" N    5° 15' 51.15" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 246 m
span between pontoons 113.25 m
deck deck width 10 m
deck level above water level min. 11.0 m

Materials

deck steel
pontoons lightweight concrete

Chronology

August 1991

Construction begins.

September 1994

End of construction.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004000
  • Published on:
    25/06/2002
  • Last updated on:
    10/02/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine