0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Cầu Long Biên
Beginning of works: 1898
Completion: 28 February 1903
Status: in use

Project Type

Structure: Through truss bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge
Function / usage: Road bridge
Structure: Cantilever truss bridge

Location

Location: ,
Crosses:
  • Red River
Coordinates: 21° 2' 39.12" N    105° 51' 39.60" E
Show coordinates on a map

Technical Information

Dimensions

main span 106.20 m
total length 1 682.60 m
number of tracks 1

Materials

truss steel

Participants

Construction

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20002739
  • Published on:
    20/01/2002
  • Last updated on:
    25/10/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine