0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

For the slope stabilization of an access tunnel to the Chilina Bridge, soil nails were installed in layers.

For the slope stabilization of an access tunnel to the Chilina Bridge, soil nails were installed in layers.

Media-ID: 314425
Author/Source:

PERCOSUR E.I.R.L., Peru

Medium provided by: DYWIDAG-Systems International, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 11/12/2018

More media for this product/service available at: