Long Beach International Gateway
-
Schraeder, Robert / Mattheis, Josh (2019): Gerald Desmond Bridge Replacement Project Industry Innovations. Présenté pendant: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, pp. 284-290.
https://doi.org/10.2749/newyork.2019.0284
-
Carter, Matt / Yeung, Ngai (2016): Gerald Desmond Bridge – Challenges and Solutions for Vibration Control. Présenté pendant: IABSE Conference: Bridges and Structures Sustainability - Seeking Intelligent Solutions, Guangzhou, China, 8-11 May 2016, pp. 425-434.
https://doi.org/10.2749/222137816819258780
-
Tarasuik, Luke / Mattheis, Josh / Carter, Matt (2024): Long Beach International Gateway Bridge, Los Angeles. Dans: e-mosty, v. 2024, n. 1 (mars 2024), pp. 27-38.
-
New Long Beach bridge under scrutiny. Dans: Bridge Design & Engineering, v. 16, n. 58 (1er trimestre 2010), pp. 8.
-
Raimundo, Aquilino / Becerra Mosquera, José Antonio / Rodríguez Pereiras, Daniel (2017): Proyecto de sustitución del Gerald Desmond Bridge. Construcción de los vanos de aproximación mediante cimbra autolanzable. Présenté pendant: VII Congreso Internacional de Estructuras, Congreso de la Asociación Científico-Técnica del Hormigón Estructural (ACHE), A Coruña, 20-22 de junio de 2017.