0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Gerald Desmond Bridge Replacement Project Industry Innovations

 Gerald Desmond Bridge Replacement Project Industry Innovations
Auteur(s): ,
Présenté pendant IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, publié dans , pp. 284-290
DOI: 10.2749/newyork.2019.0284
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.16 MB

The design and construction of the Gerald Desmond Bridge Replacement brings many firsts and innovations to California’s infrastructure landscape. Preliminary engineering studies carried out for thi...
Lire plus

Détails bibliographiques

Auteur(s): (Shimmick Construction)
(Arup)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Publié dans:
Page(s): 284-290 Nombre total de pages (du PDF): 7
Page(s): 284-290
Nombre total de pages (du PDF): 7
DOI: 10.2749/newyork.2019.0284
Abstrait:

The design and construction of the Gerald Desmond Bridge Replacement brings many firsts and innovations to California’s infrastructure landscape. Preliminary engineering studies carried out for this design-build project resulted in a 305-meter cable-stayed main span bridge, 157-meter tall mono-pole towers, and single and double-celled box girder approaches built on a moveable scaffolding system.

This paper reviews some of the innovations of the winning proposal design: approach viaduct optimization, viaduct frame dynamic response balancing and tower geometry conception. The focus of the review is interaction between design and construction teams in project innovation.

The review concludes that while project innovation is best served by healthy communication between design and construction teams at the preliminary engineering phase, the most challenging innovations benefit from healthy communication maintained through execution. This way mutual constraints and objectives are conceptually recognized by the innovation, while unknown obstacles associated with executing a new idea may be addressed expediently with the collective design and construction skill set.

Mots-clé:
Pont à haubans

Ouvrages et projets