Franchissement du détroit de l'Oresund
-
Lundhus, Peter (1999): Build a link - Goals, principles, strategies and results. Présenté pendant: IABSE Conference: Cable-Stayed Bridges - Past, Present and Future, Malmö, Sweden, 2-4 June 1999, pp. 397-408.
https://doi.org/10.5169/seals-62103
-
Nissen, Jørgen (1999): Conceptual and Tender Designs for the Øresund Bridge. Dans: Structural Engineering International, v. 9, n. 1 (février 1999), pp. 36-38.
https://doi.org/10.2749/101686699780482276
-
Henriksen, Carsten / Ladefoged, Laust / Thaulow, Niels (1995): Concrete specifications for the Øresund Link. Présenté pendant: IABSE Symposium: Extending the Lifespan of Structures, San Francisco, CA, USA, August 1995, pp. 1193-1198.
https://doi.org/10.5169/seals-55332
-
Braestrup, Mikael W. (2004): Constructing Durable Strait Crossings. Présenté pendant: IABSE Symposium: Metropolitan Habitats and Infrastructure, Shanghai, China, 22-24 September 2004, pp. 24-29.
https://doi.org/10.2749/222137804796272350
-
Jansson, Anders H. (1999): Construction of the Øresund Bridge. Dans: Structural Engineering International, v. 9, n. 1 (février 1999), pp. 42-44.
https://doi.org/10.2749/101686699780482131