0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 1, v. 9
Page(s): 42-44
DOI: 10.2749/101686699780482131
Abstrait:

A design and construct contract for the resund Bridge was signed with Sundlink Contractors in November 1995. The 7845-m-long bridge consists of three parts: two approach bridges and one high bridge. The bridge is a two-level structure with an upper concrete road deck on steel trusses and a lower concrete deck for the railroad. Both concrete decks are in composite action with the structural steel. The high bridge is a stay-cable bridge with a main span of 490 m. The cables are anchored by two 203-m-high pylons, which are the highest building structures in Sweden.

Ouvrages et projets

  • Informations
    sur cette fiche
  • Reference-ID
    10000878
  • Publié(e) le:
    17.08.2001
  • Modifié(e) le:
    28.10.2016
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine