0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 1, v. 9
Seite(n): 42-44
DOI: 10.2749/101686699780482131
Abstrakt:

A design and construct contract for the resund Bridge was signed with Sundlink Contractors in November 1995. The 7845-m-long bridge consists of three parts: two approach bridges and one high bridge. The bridge is a two-level structure with an upper concrete road deck on steel trusses and a lower concrete deck for the railroad. Both concrete decks are in composite action with the structural steel. The high bridge is a stay-cable bridge with a main span of 490 m. The cables are anchored by two 203-m-high pylons, which are the highest building structures in Sweden.

Bauwerke und Projekte

  • Über diese
    Datenseite
  • Reference-ID
    10000878
  • Veröffentlicht am:
    17.08.2001
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine