Two large bridge projects in environmentally constrained areas
|
Détails bibliographiques
Auteur(s): |
António Reis
|
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010 | ||||
Publié dans: | IABSE Symposium Venice 2010 | ||||
|
|||||
Page(s): | 532-533 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2010 | ||||
DOI: | 10.2749/222137810796025708 | ||||
Abstrait: |
In large infrastructure projects a variety of environmental constraints may influence bridge design options. Two main recent bridge projects, underway in Portugal, in which the author´s design office has been involved, are discussed. |
||||
Mots-clé: |
ponts ponts mixtes
|