Two large bridge projects in environmentally constrained areas
|
Bibliografische Angaben
Autor(en): |
António Reis
|
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010 | ||||
Veröffentlicht in: | IABSE Symposium Venice 2010 | ||||
|
|||||
Seite(n): | 532-533 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2010 | ||||
DOI: | 10.2749/222137810796025708 | ||||
Abstrakt: |
In large infrastructure projects a variety of environmental constraints may influence bridge design options. Two main recent bridge projects, underway in Portugal, in which the author´s design office has been involved, are discussed. |
||||
Stichwörter: |
Brücken Umweltbelastung Verbundbrücken
|