0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Study on correction of linear and internal force of steel box girder bridge based on Zero moment method

 Study on correction of linear and internal force of steel box girder bridge based on Zero moment method
Auteur(s): , ,
Présenté pendant IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018, publié dans , pp. 550-554
DOI: 10.2749/kualalumpur.2018.0550
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.14 MB

In actual engineering, the assembly error of the beam in the construction process may cause the system linearity not to meet the design requirements. In this paper, the zero-moment method is propos...
Lire plus

Détails bibliographiques

Auteur(s): (The Second Harbor Engineering Company, Hubei , China)
(The Second Harbor Engineering Company, Hubei , China)
(The Second Harbor Engineering Company, Hubei , China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018
Publié dans:
Page(s): 550-554 Nombre total de pages (du PDF): 5
Page(s): 550-554
Nombre total de pages (du PDF): 5
DOI: 10.2749/kualalumpur.2018.0550
Abstrait:

In actual engineering, the assembly error of the beam in the construction process may cause the system linearity not to meet the design requirements. In this paper, the zero-moment method is proposed to study the construction of continuous large span steel box girder bridge. Firstly, find the position of the zero moment of the girder beam, secondly, cut the girder beam at the position of zero moment to make the beam become three-span simply supported structure, then re-weld the girder beam after the linear adjusted. The results demonstrate that the design requirements of system linearity and internal force of the beam can be meet by using the Zero moment method.

Mots-clé:
Poussage