0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Study on correction of linear and internal force of steel box girder bridge based on Zero moment method

 Study on correction of linear and internal force of steel box girder bridge based on Zero moment method
Autor(en): , ,
Beitrag für IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018, veröffentlicht in , S. 550-554
DOI: 10.2749/kualalumpur.2018.0550
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.14 MB

In actual engineering, the assembly error of the beam in the construction process may cause the system linearity not to meet the design requirements. In this paper, the zero-moment method is propos...
Weiterlesen

Bibliografische Angaben

Autor(en): (The Second Harbor Engineering Company, Hubei , China)
(The Second Harbor Engineering Company, Hubei , China)
(The Second Harbor Engineering Company, Hubei , China)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018
Veröffentlicht in:
Seite(n): 550-554 Anzahl der Seiten (im PDF): 5
Seite(n): 550-554
Anzahl der Seiten (im PDF): 5
DOI: 10.2749/kualalumpur.2018.0550
Abstrakt:

In actual engineering, the assembly error of the beam in the construction process may cause the system linearity not to meet the design requirements. In this paper, the zero-moment method is proposed to study the construction of continuous large span steel box girder bridge. Firstly, find the position of the zero moment of the girder beam, secondly, cut the girder beam at the position of zero moment to make the beam become three-span simply supported structure, then re-weld the girder beam after the linear adjusted. The results demonstrate that the design requirements of system linearity and internal force of the beam can be meet by using the Zero moment method.

Stichwörter:
Taktschiebeverfahren