The New Wiesbaden-Schierstein Bridge – 50 Years of Steel Construction
|
Détails bibliographiques
Auteur(s): |
Eberhard Pelke
Alwin Dieter |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Publié dans: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 2089-2096 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2014 | ||||
DOI: | 10.2749/222137814814068652 | ||||
Abstrait: |
The bridge spans the river Rhine and connects the state capitals of Mainz and Wiesbaden, Germany. The existing bridge was at its turning point from a static to a production-oriented engineering structure. The paper gives an insight into the deficits and damage of the existing bridge and explains the consequential requirement for a new design. |
||||
Mots-clé: |
esthétique acier pont durabilité
|