0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

New launching method of composite steel-concrete decks for replacing two bridges in Luxembourg

 New launching method of composite steel-concrete decks for replacing two bridges in Luxembourg
Auteur(s): ,
Présenté pendant IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, publié dans , pp. 1116-1123
DOI: 10.2749/guimaraes.2019.1116
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.7 MB

The deck replacement of two bridges in Luxembourg is presented, using a new launching method of composite steel-concrete box-girder decks already with the slab, which comprises also the dismantling...
Lire plus

Détails bibliographiques

Auteur(s): (Ceris-IST, University of Lisbon; GRID International, Portugal)
(Bureau d’Études Greisch, Liège, Belgium)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Publié dans:
Page(s): 1116-1123 Nombre total de pages (du PDF): 8
Page(s): 1116-1123
Nombre total de pages (du PDF): 8
DOI: 10.2749/guimaraes.2019.1116
Abstrait:

The deck replacement of two bridges in Luxembourg is presented, using a new launching method of composite steel-concrete box-girder decks already with the slab, which comprises also the dismantling of the old decks. The main construction steps for replacing the two bridge decks with typical spans of 35 m are described. The data of the new decks and the design verifications, both during construction and in service, are presented.

Mots-clé:
pont mixte acier-béton

Lieux géographiques