New launching method of composite steel-concrete decks for replacing two bridges in Luxembourg
|
Bibliografische Angaben
Autor(en): |
José J. Oliveira Pedro
(Ceris-IST, University of Lisbon; GRID International, Portugal)
Arnaud Salmon (Bureau d’Études Greisch, Liège, Belgium) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019 | ||||
Veröffentlicht in: | IABSE Symposium Guimarães 2019 | ||||
|
|||||
Seite(n): | 1116-1123 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
DOI: | 10.2749/guimaraes.2019.1116 | ||||
Abstrakt: |
The deck replacement of two bridges in Luxembourg is presented, using a new launching method of composite steel-concrete box-girder decks already with the slab, which comprises also the dismantling of the old decks. The main construction steps for replacing the two bridge decks with typical spans of 35 m are described. The data of the new decks and the design verifications, both during construction and in service, are presented. |
||||
Stichwörter: |
Stahl-Beton-Verbundbrücke
|