0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Load-carrying capacity of two 110 year old steel portal frame bridges

 Load-carrying capacity of two 110 year old steel portal frame bridges
Auteur(s):
Présenté pendant IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, publié dans , pp. 621-628
DOI: 10.2749/stockholm.2016.0600
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

The load-carrying capacity of two old steel portal frame bridges, built in 1907 and 1912 has been determined, using FE-models and taking into account the damage due to corrosion, found during inspe...
Lire plus

Détails bibliographiques

Auteur(s): (Civil Engineering Department, Ghent University, Belgium)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Publié dans:
Page(s): 621-628 Nombre total de pages (du PDF): 8
Page(s): 621-628
Nombre total de pages (du PDF): 8
Année: 2016
DOI: 10.2749/stockholm.2016.0600
Abstrait:

The load-carrying capacity of two old steel portal frame bridges, built in 1907 and 1912 has been determined, using FE-models and taking into account the damage due to corrosion, found during inspection. For this, adequate real traffic models have been used. The capacity of both bridges proved to be insufficient, mainly due to corrosion of the outside portals. The frame cross-sections are asymmetrical, since reduction of the area is considered for tension and not for compressed parts. Two alternatives are considered for refurbishment. Replacing corroded plates and profiles on site being impossible, the alternative to reduce dead weight seems more feasible.

Ouvrages et projets

Types d'ouvrages