Innovative Means and Methods for the New Champlain Bridge
|
Détails bibliographiques
Auteur(s): |
Gonzalo Osborne
(Abstract)
Jeff Rogerson (Abstract) Fréderic Guitard (Abstract) André Mylocopos (Abstract) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017 | ||||
Publié dans: | IABSE Symposium Vancouver 2017 | ||||
|
|||||
Page(s): | 2098-2105 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2017 | ||||
DOI: | 10.2749/vancouver.2017.2098 | ||||
Abstrait: |
Signature on the Saint Lawrence Construction (SSLC), a consortium comprised of SNC-Lavalin inc., Flatiron Constructors Canada, Dragados USA and EBC, is mandated to build the New Champlain Bridge Corridor Project (NCBCP). Significant challenges include:
This paper discusses the following innovative construction methods used for the New Champlain Bridge (NCB):
These erection systems were developed and selected to suit the specific challenges of the project, including speed of construction, maintenance of shipping and environmental protection areas. |
||||
Mots-clé: |
sondage
|