0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Energy Harvesting Potential of Piezoelectric Materials from Train-Bridge Interaction using Finite Element Modelling

 Energy Harvesting Potential of Piezoelectric Materials from Train-Bridge Interaction using Finite Element Modelling
Auteur(s): , , ,
Présenté pendant IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, publié dans , pp. 282-283
DOI: 10.2749/222137813806478990
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.34 MB

This paper investigates the potential for the harvesting of energy from the interaction between a train and a bridge through the use of piezoelectric materials. Two piezoelectric materials are cons...
Lire plus

Détails bibliographiques

Auteur(s):



Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Publié dans:
Page(s): 282-283 Nombre total de pages (du PDF): 7
Page(s): 282-283
Nombre total de pages (du PDF): 7
Année: 2013
DOI: 10.2749/222137813806478990
Abstrait:

This paper investigates the potential for the harvesting of energy from the interaction between a train and a bridge through the use of piezoelectric materials. Two piezoelectric materials are considered in this regard, Lead Zirconate Titanate (PZT) and PolyVinyliDene Fluoride (PVDF). A finite element analysis of train bridge interaction is carried out. The friendliness of the different trains in terms of energy harvesting potential is assessed and quantified. The speed zones conducive to maximum harvested energy are identified. The use of train-bridge interaction ensures that the energy harvesting is carried out while the bridge is under operational conditions, with minimal to no impact on the existing operation of the bridge or the rail network during energy harvesting operations. The approach is useful in terms of designing a new generation of smart bridge infrastructures and potential retrofitting of existing structures.