Design and Construction of the Mersey Gateway Bridge
|
Détails bibliographiques
Auteur(s): |
Paul Sanders
Lars Lundorf Nielsen Hugo Wood José Romo Martín Gerard Brennan John Banks |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Publié dans: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 1956-1963 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2014 | ||||
DOI: | 10.2749/222137814814068553 | ||||
Abstrait: |
Mersey Gateway Bridge is a 2.25km long major estuary crossing under construction in the UK. It is being built as part of a concession agreement to increase capacity across the upper Mersey Estuary. The bridge features a 1km long three tower cable stayed bridge. |