Design and Construction of the Mersey Gateway Bridge
|
Bibliografische Angaben
Autor(en): |
Paul Sanders
Lars Lundorf Nielsen Hugo Wood José Romo Martín Gerard Brennan John Banks |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Veröffentlicht in: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Seite(n): | 1956-1963 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2014 | ||||
DOI: | 10.2749/222137814814068553 | ||||
Abstrakt: |
Mersey Gateway Bridge is a 2.25km long major estuary crossing under construction in the UK. It is being built as part of a concession agreement to increase capacity across the upper Mersey Estuary. The bridge features a 1km long three tower cable stayed bridge. |
||||
Stichwörter: |
externe Vorspannung
|