John Banks
- Temporary Works Toolkit. Part 9: The role of the principal designer with reference to temporary works. Dans: The Structural Engineer, v. 95, n. 3 (mars 2017). (2017):
- Design and Construction of Mersey Gateway Bridge, U.K. Présenté pendant: Structures Congress 2019, Orlando, Florida, 24-27 April 2019. (2019):
- (2014): Design and Construction of the Mersey Gateway Bridge. Présenté pendant: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- (2016): Mersey Gateway Bridge (UK) - Design for Construction. Présenté pendant: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.