Checking of Bridges for the new Taiwan High Speed Rail
|
Détails bibliographiques
Auteur(s): |
Uwe Reinbeck
|
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Publié dans: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Page(s): | 534-535 | ||||
Nombre total de pages (du PDF): | 7 | ||||
Année: | 2007 | ||||
DOI: | 10.2749/weimar.2007.0493 | ||||
Abstrait: |
This paper deals with the independent checking of the design of bridges for the civil contracts C210 and C215 of the Taiwan High Speed Rail project. Both contracts covered a length of 51.4 km including a total length of 31.6 km of bridges (61.5%). |
||||
Mots-clé: |
ponts
|