Checking of Bridges for the new Taiwan High Speed Rail
|
Bibliografische Angaben
Autor(en): |
Uwe Reinbeck
|
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Veröffentlicht in: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Seite(n): | 534-535 | ||||
Anzahl der Seiten (im PDF): | 7 | ||||
Jahr: | 2007 | ||||
DOI: | 10.2749/weimar.2007.0493 | ||||
Abstrakt: |
This paper deals with the independent checking of the design of bridges for the civil contracts C210 and C215 of the Taiwan High Speed Rail project. Both contracts covered a length of 51.4 km including a total length of 31.6 km of bridges (61.5%). |
||||
Stichwörter: |
Brücken Design und Build
|