A Cable-stayed bridge with Elliptic pylons
|
Détails bibliographiques
Auteur(s): |
Se Hoon Choi
Jae Geum Kim Hee Won Song Hyun Tae Nam |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Publié dans: | IABSE Congress Seoul 2012 | ||||
|
|||||
Page(s): | 842-848 | ||||
Nombre total de pages (du PDF): | 7 | ||||
DOI: | 10.2749/222137912805111195 | ||||
Abstrait: |
This paper introduces the cable-stayed bridge which has the elliptic pylons. This bridge is the main bridge of the 4th construction zone, and has two spans and each of them is 115m long (2@115= 230m). The deck of the bridge is made of steel plate. It is located in the connecting road to Incheon Grand Bridge. There are several design issues; such as the landscape design concept of the bridge and the structural behaviour of the cable-stayed bridge. Also, a construction issue is the pylon roll- up erection. |
||||
Mots-clé: |
Pont à haubans pylône elliptique
|