A Cable-stayed bridge with Elliptic pylons
|
Bibliografische Angaben
Autor(en): |
Se Hoon Choi
Jae Geum Kim Hee Won Song Hyun Tae Nam |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Veröffentlicht in: | IABSE Congress Seoul 2012 | ||||
|
|||||
Seite(n): | 842-848 | ||||
Anzahl der Seiten (im PDF): | 7 | ||||
DOI: | 10.2749/222137912805111195 | ||||
Abstrakt: |
This paper introduces the cable-stayed bridge which has the elliptic pylons. This bridge is the main bridge of the 4th construction zone, and has two spans and each of them is 115m long (2@115= 230m). The deck of the bridge is made of steel plate. It is located in the connecting road to Incheon Grand Bridge. There are several design issues; such as the landscape design concept of the bridge and the structural behaviour of the cable-stayed bridge. Also, a construction issue is the pylon roll- up erection. |
||||
Stichwörter: |
Schrägseilbrücke elliptischer Pylon
|