0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

The Behavior of Rion - Antirion Bridge Seismic Protection System During the Earthquake of "Achaia-Ilia" on June 8, 2008

The Behavior of Rion - Antirion Bridge Seismic Protection System During the Earthquake of "Achaia-Ilia" on June 8, 2008
Auteur(s): , ,
Présenté pendant IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, publié dans , pp. 306-307
DOI: 10.2749/222137810796024619
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.03 MB

On June 08, 2008 at 15:25 a strong earthquake with moment magnitude Mw=6,5, named “Achaia- Ilia” occurred in Greece. The focal depth was estimated to be around 30km and the epicentre was located at...
Lire plus

Détails bibliographiques

Auteur(s):


Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010
Publié dans:
Page(s): 306-307 Nombre total de pages (du PDF): 8
Page(s): 306-307
Nombre total de pages (du PDF): 8
Année: 2010
DOI: 10.2749/222137810796024619
Abstrait:

On June 08, 2008 at 15:25 a strong earthquake with moment magnitude Mw=6,5, named “Achaia- Ilia” occurred in Greece. The focal depth was estimated to be around 30km and the epicentre was located at a distance 36 km SW from the Rion-Antirion Bridge.

The Rion-Antirion Bridge, a five-span cable-stay bridge (286m + 560m + 560m + 560m + 286m), has been designed to withstand earthquakes with P.G.A. of 0,48g and tectonic movements up to 2m between consecutive pylons. In order to satisfy the above requirements the deck superstructure was made continuous for the full length of 2252m and fully suspended from the four pylons.

An innovative energy dissipation system, designed by Vinci and developed by FIP Industriale, connects the deck to the pylons and limits the lateral movement of the deck during an earthquake, while dissipating the seismic energy with huge – never built before - viscous dampers. The bridge is also equipped with a complete monitoring system capable of collecting high frequency data at critical parts of the structure during a seismic or wind dynamic event.

The paper presents evidences of the good performance of the dissipation system during the above mentioned earthquake. From the analysis of the monitoring data collected during the event and the thorough inspections performed after, it was confirmed that the behaviour of the bridge was in accordance with the analytical predictions and well within the serviceability limit states.

Mots-clé:
Pont à haubans

Ouvrages et projets