Almonte Viaduct. Detailed Design
|
Détails bibliographiques
Auteur(s): |
David Arribas
(MSc Civil Engineer, FCC Construccion, Madrid, SPAIN)
Pablo Bernal (MSc Civil Engineer, FCC Construccion, Madrid, SPAIN) José María Pérez (MSc Civil Engineer, Madrid, SPAIN) José Ignacio González (MSc Civil Engineer, Madrid, SPAIN) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016 | ||||
Publié dans: | IABSE Congress Stockholm, 2016 | ||||
|
|||||
Page(s): | 2283-2290 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2016 | ||||
DOI: | 10.2749/stockholm.2016.2274 | ||||
Abstrait: |
Given the scale involved, construction of this bridge necessitated more comprehensive engineering and detailing for some of its components. These tasks were performed by the builder’s staff to ensure coordination as full as possible between the design and the construction teams, as described in this paper. |