0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

A30 Bridge Montreal - Aerodynamic Stability of Parallel Box-Girders

Auteur(s):



Médium: papier de conférence
Langue(s): anglais
Conférence: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Publié dans:
Année: 2011
Abstrait:

The proposed Beauharnois Canal Bridge is part of a 42km extension of Highway 30 in Quebec, Canada, and is located between the towns of Beauharnois and Melocheville. The bridge consists of twin composite box girder sections with bluff concrete edge parapets. An aerodynamic assessment was carried out in early stages of the project which highlighted the risks associated with vortex- induced vibrations, particularly during the construction stages. Extensive wind tunnel tests were conducted to evaluate the aeroelastic performance of the bridge at various construction stages and in permanent condition. Temporary mitigation measures and construction staging sequences were developed to improve the performance of the decks during construction.

Mots-clé:
essai en soufflerie construction de ponts barrières de sécurité

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant.
  • Informations
    sur cette fiche
  • Reference-ID
    10065266
  • Publié(e) le:
    03.10.2011
  • Modifié(e) le:
    05.07.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine