- (2024): Correction: Zhou et al. Optimization of Blasting Parameters Considering Both Vibration Reduction and Profile Control: A Case Study in a Mountain Hard Rock Tunnel. Buildings 2024, 14, 1421. Dans: Buildings, v. 14, n. 11 (22 octobre 2024).
- (2024): Optimization of Blasting Parameters Considering Both Vibration Reduction and Profile Control: A Case Study in a Mountain Hard Rock Tunnel. Dans: Buildings, v. 14, n. 5 (24 avril 2024).