- (2024): Correction: Zhou et al. Optimization of Blasting Parameters Considering Both Vibration Reduction and Profile Control: A Case Study in a Mountain Hard Rock Tunnel. Buildings 2024, 14, 1421. In: Buildings, v. 14, n. 11 (22 Oktober 2024).
- (2024): Optimization of Blasting Parameters Considering Both Vibration Reduction and Profile Control: A Case Study in a Mountain Hard Rock Tunnel. In: Buildings, v. 14, n. 5 (24 April 2024).