Jonas Šaparauskas
- (2021): Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach. Dans: Buildings, v. 11, n. 9 (25 août 2021).
- Solving Construction Project Selection Problem By A New Uncertain Weighting and Ranking Based on Compromise Solution With Linear Assignment Approach. Dans: Journal of Civil Engineering and Management, v. 25, n. 3 (juin 2019). (2019):
- Critical Factors of the Application of Nanotechnology in Construction Industry By Using Anp Technique Under Fuzzy Intuitionistic Environment. Dans: Journal of Civil Engineering and Management, v. 23, n. 7 (juillet 2017). (2017):
- An Integrated Fuzzy Anp–qfd Approach for Green Building Assessment. Dans: Journal of Civil Engineering and Management, v. 22, n. 4 (août 2016). (2016):
- Proposing A Neural Network Model To Predict Time and Cost Claims in Construction Projects. Dans: Journal of Civil Engineering and Management, v. 22, n. 7 (juillet 2016). (2016):
- Reinforcement of Laminated Glass Facades Against the Blast Load. Dans: Journal of Civil Engineering and Management, v. 21, n. 8 (novembre 2015). (2015):
- Multiple Criteria Evaluation of Buildings With Emphasis on Sustainability. Dans: Journal of Civil Engineering and Management, v. 9, n. 4 (décembre 2003). (2003):
- Integrated Multi-Criteria Evaluation of House's Plan Shape Based on the Edas and Swara Methods. Dans: Engineering Structures and Technologies, v. 9, n. 3 (octobre 2017). (2017):