Proposing A Neural Network Model To Predict Time and Cost Claims in Construction Projects
Auteur(s): |
Vahidreza Yousefi
Siamak Haji Yakhchali Mostafa Khanzadi Ehsan Mehrabanfar Jonas Šaparauskas |
---|---|
Médium: | article de revue |
Langue(s): | letton |
Publié dans: | Journal of Civil Engineering and Management, juillet 2016, n. 7, v. 22 |
Page(s): | 967-978 |
DOI: | 10.3846/13923730.2016.1205510 |
- Informations
sur cette fiche - Reference-ID
10354341 - Publié(e) le:
13.08.2019 - Modifié(e) le:
13.08.2019