Siamak Haji Yakhchali
- Modified Bayesian Network–Based Risk Analysis of Construction Projects: Case Study of South Pars Gas Field Development Projects. Dans: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 4, n. 4 (décembre 2018). (2018):
- Proposing A Neural Network Model To Predict Time and Cost Claims in Construction Projects. Dans: Journal of Civil Engineering and Management, v. 22, n. 7 (juillet 2016). (2016):
- Developing a fuzzy model based on subtractive clustering for road header performance prediction. Dans: Automation in Construction, v. 35 (novembre 2013). (2013):
- Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods. Dans: Tunnelling and Underground Space Technology, v. 30 (juillet 2012). (2012):