Siamak Haji Yakhchali
- Modified Bayesian Network–Based Risk Analysis of Construction Projects: Case Study of South Pars Gas Field Development Projects. In: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 4, n. 4 (Dezember 2018). (2018):
- Proposing A Neural Network Model To Predict Time and Cost Claims in Construction Projects. In: Journal of Civil Engineering and Management, v. 22, n. 7 (Juli 2016). (2016):
- Developing a fuzzy model based on subtractive clustering for road header performance prediction. In: Automation in Construction, v. 35 (November 2013). (2013):
- Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods. In: Tunnelling and Underground Space Technology, v. 30 (Juli 2012). (2012):