Jonas Šaparauskas
- (2021): Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach. In: Buildings, v. 11, n. 9 (25 August 2021).
- Solving Construction Project Selection Problem By A New Uncertain Weighting and Ranking Based on Compromise Solution With Linear Assignment Approach. In: Journal of Civil Engineering and Management, v. 25, n. 3 (Juni 2019). (2019):
- Critical Factors of the Application of Nanotechnology in Construction Industry By Using Anp Technique Under Fuzzy Intuitionistic Environment. In: Journal of Civil Engineering and Management, v. 23, n. 7 (Juli 2017). (2017):
- An Integrated Fuzzy Anp–qfd Approach for Green Building Assessment. In: Journal of Civil Engineering and Management, v. 22, n. 4 (August 2016). (2016):
- Proposing A Neural Network Model To Predict Time and Cost Claims in Construction Projects. In: Journal of Civil Engineering and Management, v. 22, n. 7 (Juli 2016). (2016):
- Reinforcement of Laminated Glass Facades Against the Blast Load. In: Journal of Civil Engineering and Management, v. 21, n. 8 (November 2015). (2015):
- Multiple Criteria Evaluation of Buildings With Emphasis on Sustainability. In: Journal of Civil Engineering and Management, v. 9, n. 4 (Dezember 2003). (2003):
- Integrated Multi-Criteria Evaluation of House's Plan Shape Based on the Edas and Swara Methods. In: Engineering Structures and Technologies, v. 9, n. 3 (Oktober 2017). (2017):