Hosny, Abdelhady / Nik-Bakht, Mazdak / Moselhi, Osama (2022): Physical Distancing Analytics for Construction Planning Using 4D BIM. Dans: Journal of Computing in Civil Engineering, v. 36, n. 4 (juillet 2022).
https://doi.org/10.1061/(asce)cp.1943-5487.0001023
-
Bhatia, Angat Pal Singh / Han, SangHyeok / Moselhi, Osama (2022): A simulation-based statistical method for planning modular construction manufacturing. Dans: Journal of Information Technology in Construction, v. 27 (janvier 2022).
https://doi.org/10.36680/j.itcon.2022.007
-
Elkabalawy, Moaaz / Moselhi, Osama (2021): Optimized resource-constrained method for project schedule compression. Dans: Engineering, Construction and Architectural Management, v. 29, n. 5 (juin 2021).
https://doi.org/10.1108/ecam-12-2020-1019
-
Assad, Ahmed / Moselhi, Osama / Zayed, Tarek (2021): Resilience-Driven Sustainability-Based Rehabilitation Planning for Water Distribution Networks. Dans: Journal of Construction Engineering and Management, v. 147, n. 8 (août 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002100
-
Farzad Moosavi, S. / Moselhi, Osama (2014): Review of Detailed Schedules in Building Construction. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 6, n. 3 (août 2014).
https://doi.org/10.1061/(asce)la.1943-4170.0000142
-
Bakry, Ibrahim / Moselhi, Osama / Zayed, Tarek (2016): Optimized scheduling and buffering of repetitive construction projects under uncertainty. Dans: Engineering, Construction and Architectural Management, v. 23, n. 6 (novembre 2016).
https://doi.org/10.1108/ecam-05-2014-0069
-
Ha, Kinh H. / Fazio, Paul / Moselhi, Osama (1978): Orthotropic Membrane for Tall Building Analysis. Dans: Journal of the Structural Division (ASCE), v. 104, n. 9 (septembre 1978).
https://doi.org/10.1061/jsdeag.0004991
-
Moselhi, Osama / Roghabadi, Mohammadjavad Arabpour (2020): Risk quantification using fuzzy-based Monte Carlo simulation. Dans: Journal of Information Technology in Construction, v. 25 (octobre 2020).
https://doi.org/10.36680/j.itcon.2020.005
-
Assad, Ahmed / Moselhi, Osama / Zayed, Tarek (2020): Resilience-Driven Multiobjective Restoration Planning for Water Distribution Networks. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 34, n. 4 (août 2020).
https://doi.org/10.1061/(asce)cf.1943-5509.0001478
-
Moselhi, Osama / Poulton, Charles (1991): Planning and Control of Remote Projects. Dans: Journal of Management in Engineering (ASCE), v. 7, n. 1 (janvier 1991).
https://doi.org/10.1061/(asce)9742-597x(1991)7:1(83)
-
Moselhi, Osama / Roofigari-Esfahan, Nazila (2013): Project schedule compression: a multi-objective methodology. Dans: Construction Innovation, v. 13, n. 4 (octobre 2013).
https://doi.org/10.1108/ci-03-2011-0010
-
Moselhi, Osama / Khan, Zafar (2012): Significance ranking of parameters impacting construction labour productivity. Dans: Construction Innovation, v. 12, n. 3 (juillet 2012).
https://doi.org/10.1108/14714171211244541
-
Razavi, Saiedeh N. / Montaser, Ali / Moselhi, Osama (2012): RFID deployment protocols for indoor construction. Dans: Construction Innovation, v. 12, n. 2 (avril 2012).
https://doi.org/10.1108/14714171211215967
-
Fanaei, Seyedeh Sara / Moselhi, Osama / Alkass, Sabah (2019): Performance Prediction of Construction Projects using Soft Computing Methods. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 46, n. 7 (juillet 2019).
https://doi.org/10.1139/cjce-2018-0305
-
Moselhi, Osama / El‐Rayes, Khaled (1993): Scheduling of Repetitive Projects with Cost Optimization. Dans: Journal of Construction Engineering and Management, v. 119, n. 4 (décembre 1993).
https://doi.org/10.1061/(asce)0733-9364(1993)119:4(681)
-
El-Rayes, Khaled / Moselhi, Osama (2001): Optimizing Resource Utilization for Repetitive Construction Projects. Dans: Journal of Construction Engineering and Management, v. 127, n. 1 (février 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:1(18)
-
Lorterapong, Pasit / Moselhi, Osama (1996): Project-Network Analysis Using Fuzzy Sets Theory. Dans: Journal of Construction Engineering and Management, v. 122, n. 4 (décembre 1996).
https://doi.org/10.1061/(asce)0733-9364(1996)122:4(308)
-
Montaser, Ali / Moselhi, Osama (2014): RFID indoor location identification for construction projects. Dans: Automation in Construction, v. 39 (avril 2014).
https://doi.org/10.1016/j.autcon.2013.06.012
-
Salman, Alaa / Moselhi, Osama / Zayed, Tarek (2013): Scheduling Model for Rehabilitation of Distribution Networks Using MINLP. Dans: Journal of Construction Engineering and Management, v. 139, n. 5 (mai 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000578
-
Marzouk, Mohamed / Moselhi, Osama (2002): Simulation optimization for earthmoving operations using genetic algorithms. Dans: Construction Management and Economics, v. 20, n. 6 (septembre 2002).
https://doi.org/10.1080/01446190210156064
-
Moselhi, Osama / Deb, Bikash (1993): Project Selection Considering Risk. Dans: Construction Management and Economics, v. 11, n. 1 (janvier 1993).
https://doi.org/10.1080/01446199300000063
-
El-Rayes, Khaled / Moselhi, Osama (1998): Resource-driven scheduling of repetitive activities. Dans: Construction Management and Economics, v. 16, n. 4 (juillet 1998).
https://doi.org/10.1080/014461998372213
-
Salah, Ahmad / Moselhi, Osama (2016): Risk identification and assessment for engineering procurement construction management projects using fuzzy set theory. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 5 (mai 2016).
https://doi.org/10.1139/cjce-2015-0154
-
Moselhi, Osama / Hason, Stanley (1989): Robotics in construction: implementation and economic evaluation. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 16, n. 5 (octobre 1989).
https://doi.org/10.1139/l89-101
-
Moselhi, Osama / Hegazy, Tarek / Fazio, Paul (1992): Potential applications of neural networks in construction. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 19, n. 3 (juin 1992).
https://doi.org/10.1139/l92-061
-
Moselhi, Osama (1993): Schedule compression using the direct stiffness method. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 1 (février 1993).
https://doi.org/10.1139/l93-007
-
Osman, Hesham / Atef, Ahmed / Moselhi, Osama (2012): Optimizing Inspection Policies for Buried Municipal Pipe Infrastructure. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 26, n. 3 (juin 2012).
https://doi.org/10.1061/(asce)cf.1943-5509.0000216
-
Wang, Yong / Zayed, Tarek / Moselhi, Osama (2009): Prediction Models for Annual Break Rates of Water Mains. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 23, n. 1 (février 2009).
https://doi.org/10.1061/(asce)0887-3828(2009)23:1(47)
-
Khan, Zafar / Zayed, Tarek / Moselhi, Osama (2010): Structural Condition Assessment of Sewer Pipelines. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 24, n. 2 (avril 2010).
https://doi.org/10.1061/(asce)cf.1943-5509.0000081
-
Moselhi, Osama (1988): Post‐Construction Performance of 4.6‐km Breakwater. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 2, n. 3 (août 1988).
https://doi.org/10.1061/(asce)0887-3828(1988)2:3(159)