Optimized scheduling and buffering of repetitive construction projects under uncertainty
Auteur(s): |
Ibrahim Bakry
Osama Moselhi Tarek Zayed |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, novembre 2016, n. 6, v. 23 |
Page(s): | 782-800 |
DOI: | 10.1108/ecam-05-2014-0069 |
- Informations
sur cette fiche - Reference-ID
10576540 - Publié(e) le:
26.02.2021 - Modifié(e) le:
26.02.2021