Osama Moselhi
- Workspace planning in construction: non-deterministic factors. Dans: Automation in Construction, v. 116 (août 2020). (2020):
- Web‐based integrated project control system. Dans: Construction Management and Economics, v. 22, n. 1 (janvier 2004). (2004):
- Study of the Suitability of Existing Deterioration Models for Water Mains. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 23, n. 1 (février 2009). (2009):
- Two-tier data fusion method for bridge condition assessment. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 45, n. 3 (mars 2018). (2018):