-
Gil, Daeyoung / Lee, Ghang (2024): Zero-shot monitoring of construction workers' personal protective equipment based on image captioning. Dans: Automation in Construction, v. 164 (août 2024).
https://doi.org/10.1016/j.autcon.2024.105470
-
Ko, Hune-Bum / Lee, Ghang / Won, Jong-Sung (2011): 콘크리트 강도평가를 위한 인발장치와 후매입 인발볼트의 개발 (Development of Post-installable Pullout Bolts and a Loading Device for Evaluating Concrete Strength). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 11, n. 3 (juin 2011).
https://doi.org/10.5345/jkic.2011.06.3.229
-
Yun, Seok-heon / Lee, Ghang (2010): 무선 RF모뎀과 GPS를 통합한 타워크레인의 철골부재의 실시간 양중위치 추적시스템 개발 (Development of a Real-time Lifting-path Tracking System of a Tower-crane for Steel Members based on an Integrated Wireless RF Modem and GPS System). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 3 (juin 2010).
https://doi.org/10.5345/jkic.2010.10.3.065
-
Yong, Gunwoo / Jeon, Kahyun / Gil, Daeyoung / Lee, Ghang (2023): Prompt engineering for zero‐shot and few‐shot defect detection and classification using a visual‐language pretrained model. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 38, n. 11 (avril 2023).
https://doi.org/10.1111/mice.12954
-
Yong, Gunwoo / Lee, Ghang (2022): Trends, Topics, Leaders, Influential Studies, and Future Challenges of Machine Learning Studies in the Rail Industry. Dans: Journal of Infrastructure Systems, v. 28, n. 2 (juin 2022).
https://doi.org/10.1061/(asce)is.1943-555x.0000691
-
Jeong, Min / Lee, Ghang (2015): Quantitative Model for Predicting the Referential Intention of Construction Management Services. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 5 (septembre 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000333
-
Ham, Sungil / Cho, Heayon / Lee, Hyunsoo / Lee, Ghang (2019): Prototype development of responsive kinetic façade control system for the elderly based on Ambient Assisted Living. Dans: Architectural Science Review, v. 62, n. 4 (juillet 2019).
https://doi.org/10.1080/00038628.2019.1614902
-
Ham, Sungil / Lee, Ghang (2018): Space-connector model for representing the geometric properties of connections between spaces. Dans: Architectural Science Review, v. 61, n. 6 (octobre 2018).
https://doi.org/10.1080/00038628.2018.1491827
-
Ham, Sungil / Lee, Ghang (2017): Time-Based Joining Method for Generating Phylogenetic Trees of Architectural Plans. Dans: Journal of Computing in Civil Engineering, v. 31, n. 2 (mars 2017).
https://doi.org/10.1061/(asce)cp.1943-5487.0000626
-
Jung, WooYoung / Lee, Ghang (2016): Slim BIM Charts for Rapidly Visualizing and Quantifying Levels of BIM Adoption and Implementation. Dans: Journal of Computing in Civil Engineering, v. 30, n. 4 (juillet 2016).
https://doi.org/10.1061/(asce)cp.1943-5487.0000554
-
Lee, Ghang / Jeong, Jiyong / Won, Jongsung / Cho, Chiyon / You, Seok-joon / Ham, Sungil / Kang, Hoonsig (2014): Query Performance of the IFC Model Server Using an Object-Relational Database Approach and a Traditional Relational Database Approach. Dans: Journal of Computing in Civil Engineering, v. 28, n. 2 (mars 2014).
https://doi.org/10.1061/(asce)cp.1943-5487.0000256
-
Lee, Ghang (2011): What Information Can or Cannot Be Exchanged?. Dans: Journal of Computing in Civil Engineering, v. 25, n. 1 (janvier 2011).
https://doi.org/10.1061/(asce)cp.1943-5487.0000062
-
Won, Jongsung / Lee, Ghang / Dossick, Carrie / Messner, John (2013): Where to Focus for Successful Adoption of Building Information Modeling within Organization. Dans: Journal of Construction Engineering and Management, v. 139, n. 11 (novembre 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000731
-
Lee, Ghang / Eastman, Charles M. / Sacks, Rafael (2007): Twelve Design Patterns for Integrating and Normalizing Product Model Schemas. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 22, n. 3 (avril 2007).
https://doi.org/10.1111/j.1467-8667.2007.00475.x
-
Sacks, Rafael / Eastman, Charles M. / Lee, Ghang (2004): Parametric 3D modeling in building construction with examples from precast concrete. Dans: Automation in Construction, v. 13, n. 3 (mai 2004).
https://doi.org/10.1016/s0926-5805(03)00043-8
-
Lee, Ghang / Sacks, Rafael / Eastman, Charles (2007): Product data modeling using GTPPM — A case study. Dans: Automation in Construction, v. 16, n. 3 (mai 2007).
https://doi.org/10.1016/j.autcon.2006.05.004
-
Lee, Ghang / Sacks, Rafael / Eastman, Charles M. (2006): Specifying parametric building object behavior (BOB) for a building information modeling system. Dans: Automation in Construction, v. 15, n. 6 (novembre 2006).
https://doi.org/10.1016/j.autcon.2005.09.009
-
Lee, Ghang / Kim, Jonghoon "Walter" (2014): Parallel vs. Sequential Cascading MEP Coordination Strategies: A Pharmaceutical Building Case Study. Dans: Automation in Construction, v. 43 (juillet 2014).
https://doi.org/10.1016/j.autcon.2014.03.004
-
Sacks, Rafael / Eastman, Charles E. / Lee, Ghang (2003): Process Improvements in Precast Concrete Construction Using Top-Down Parametric 3-D Computer Modeling. Dans: PCI Journal, v. 48, n. 3 (mai 2003).
https://doi.org/10.15554/pcij.05012003.46.55
-
Sacks, Rafael / Eastman, Charles M. / Lee, Ghang / Orndorff, David (2005): A Target Benchmark of the Impact of Three-Dimensional Parametric Modeling in Precast Construction. Dans: PCI Journal, v. 50, n. 4 (juillet 2005).
https://doi.org/10.15554/pcij.07012005.126.139
-
Jang, Sejun / Lee, Ghang (2018): Process, productivity, and economic analyses of BIM–based multi-trade prefabrication—A case study. Dans: Automation in Construction, v. 89 (mai 2018).
https://doi.org/10.1016/j.autcon.2017.12.035
-
Kim, Hyunoh / Lee, Ghang / Cho, Jehyun (2018): Prototype development and test of a server-independent smart exit sign system: An algorithm, a hardware configuration, and its communication reliability. Dans: Automation in Construction, v. 90 (juin 2018).
https://doi.org/10.1016/j.autcon.2018.02.034