-
Jang, Suhyung / Lee, Ghang (2024): BIM Library Transplant: Bridging Human Expertise and Artificial Intelligence for Customized Design Detailing. Dans: Journal of Computing in Civil Engineering, v. 38, n. 2 (mars 2024).
https://doi.org/10.1061/jccee5.cpeng-5680
-
Suh, Bong-Gyo / Lee, Ghang / Yun, Seok-heon (2013): Adoption of Virtual Technology to the Development of a BIM based PMIS. Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 4 (août 2013).
https://doi.org/10.5345/jkibc.2013.13.4.333
-
Kim, Hong-Hyun / Lee, Ghang (2007): FMEA 기법을 활용한 크레인 관련 중대 재해의 정량적 분석에 관한 연구 (A Quantitative Analysis of Fatal Accidents Related to Cranes Using the FMEA Method). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 7, n. 3 (septembre 2007).
https://doi.org/10.5345/jkic.2007.7.3.115
-
Jeon, Kahyun / Lee, Ghang / Yang, Seongmin / Kim, Yonghan / Suh, Seungah (2024): Dynamic building defect categorization through enhanced unsupervised text classification with domain-specific corpus embedding methods. Dans: Automation in Construction, v. 157 (janvier 2024).
https://doi.org/10.1016/j.autcon.2023.105182
-
Cho, Jehyun / Lee, Ghang / Song, Taeseok / David Jeong, H. (2023): Chatbot-engaged construction daily work report using mobile messenger. Dans: Automation in Construction, v. 154 (octobre 2023).
https://doi.org/10.1016/j.autcon.2023.105007
-
Sacks, Rafael / Eastman, Charles / Lee, Ghang / Teicholz, Paul (2018): BIM Handbook. A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers. 3ème édition, John Wiley & Sons, Inc., Hoboken (États-Unis), ISBN 9781119287568.
https://doi.org/10.1002/9781119287568
-
Jeon, Kahyun / Lee, Ghang / Yang, Seongmin / David Jeong, H. (2022): Named entity recognition of building construction defect information from text with linguistic noise. Dans: Automation in Construction, v. 143 (novembre 2022).
https://doi.org/10.1016/j.autcon.2022.104543
-
Ko, Taewoo / David Jeong, H. / Lee, Ghang (2021): Natural Language Processing–Driven Model to Extract Contract Change Reasons and Altered Work Items for Advanced Retrieval of Change Orders. Dans: Journal of Construction Engineering and Management, v. 147, n. 11 (novembre 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002172
-
Uhm, Miyoung / Lee, Ghang (2021): Information Requirements for Managing Higher Education Facilities Using Building Information Modeling: Triangular Study of US and Korean Cases. Dans: Journal of Computing in Civil Engineering, v. 35, n. 6 (novembre 2021).
https://doi.org/10.1061/(asce)cp.1943-5487.0000989
-
Chung, Jihoon / Lee, Ghang / Kim, Jung-Hoon (2021): Framework for technical specifications of 3D concrete printers. Dans: Automation in Construction, v. 127 (juillet 2021).
https://doi.org/10.1016/j.autcon.2021.103732
-
Lee, Ghang / Borrmann, André (2020): BIM policy and management. Dans: Construction Management and Economics, v. 38, n. 5 (28 mars 2020).
https://doi.org/10.1080/01446193.2020.1726979
-
Jang, Sejun / Jeong, Yeonsuk / Lee, Ghang / Kang, Youngcheol (2019): Enhancing Subcontractors' Participation in BIM-Based Design Coordination under a DBB Contract. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 6 (novembre 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000714
-
Park, Jae Hyuk / Lee, Ghang (2017): Design coordination strategies in a 2D and BIM mixed-project environment: social dynamics and productivity. Dans: Building Research & Information, v. 45, n. 6 ( 2017).
https://doi.org/10.1080/09613218.2017.1288998
-
Jang, Sejun / Lee, Ghang (2018): Impact of organizational factors on delays in BIM-based coordination from a decision-making view: a case study. Dans: Journal of Civil Engineering and Management, v. 24, n. 1 (mars 2018).
https://doi.org/10.3846/jcem.2018.296
-
Lee, Ghang (2009): Concept-Based Method for Extracting Valid Subsets from an EXPRESS Schema. Dans: Journal of Computing in Civil Engineering, v. 23, n. 2 (mars 2009).
https://doi.org/10.1061/(asce)0887-3801(2009)23:2(128)
-
Lee, Ghang / Won, Jongsung / Ham, Sungil / Shin, Yuna (2011): Metrics for Quantifying the Similarities and Differences between IFC Files. Dans: Journal of Computing in Civil Engineering, v. 25, n. 2 (mars 2011).
https://doi.org/10.1061/(asce)cp.1943-5487.0000077
-
Won, Jongsung / Lee, Ghang / Cho, Chiyon (2013): No-Schema Algorithm for Extracting a Partial Model from an IFC Instance Model. Dans: Journal of Computing in Civil Engineering, v. 27, n. 6 (novembre 2013).
https://doi.org/10.1061/(asce)cp.1943-5487.0000320
-
Lee, Chijoo / Hong, Taehoon / Lee, Ghang / Jeong, Jiyoung (2012): Life-Cycle Cost Analysis on Glass Type of High-Rise Buildings for Increasing Energy Efficiency and Reducing CO2 Emissions in Korea. Dans: Journal of Construction Engineering and Management, v. 138, n. 7 (juillet 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000502
-
Koo, Bonsang / Shin, Byungjin / Lee, Ghang (2017): A cost-plus estimating framework for BIM related design and engineering services. Dans: KSCE Journal of Civil Engineering, v. 21, n. 7 (mai 2017).
https://doi.org/10.1007/s12205-017-1808-y
-
Lee, Ghang / Kim, Hong-Hyun / Lee, Chi-Joo / Ham, Sung-Il / Yun, Seok-heon / Cho, Hunhee / Kim, Bong Keun / Kim, Gu Taek / Kim, Kyunghwan (2009): A laser-technology-based lifting-path tracking system for a robotic tower crane. Dans: Automation in Construction, v. 18, n. 7 (novembre 2009).
https://doi.org/10.1016/j.autcon.2009.03.011
-
Lee, Ghang / Park, Harrison Kwangho / Won, Jongsung (2012): D3 City project — Economic impact of BIM-assisted design validation. Dans: Automation in Construction, v. 22 (mars 2012).
https://doi.org/10.1016/j.autcon.2011.12.003
-
Lee, Chijoo / Lee, Ghang / Park, Suyeul / Cho, Joonbeom (2012): Analysis of field applicability of the rotation-controllable tower-crane hook block. Dans: Automation in Construction, v. 21 (janvier 2012).
https://doi.org/10.1016/j.autcon.2011.05.015
-
Lee, Ghang / Cho, Joonbeom / Ham, Sungil / Lee, Taekwan / Lee, Gaang / Yun, Seok-heon / Yang, Hyung-Jun (2012): A BIM- and sensor-based tower crane navigation system for blind lifts. Dans: Automation in Construction, v. 26 (octobre 2012).
https://doi.org/10.1016/j.autcon.2012.05.002
-
Cho, Jehyun / Lee, Ghang / Lee, Seungjae (2015): An automated direction setting algorithm for a smart exit sign. Dans: Automation in Construction, v. 59 (novembre 2015).
https://doi.org/10.1016/j.autcon.2015.05.004
-
Lee, Gaang / Lee, Ghang / Lee, Taekwan (2012): Field applicability and feasibility of the automated non-powered multi-beam lifting system. Dans: Automation in Construction, v. 28 (décembre 2012).
https://doi.org/10.1016/j.autcon.2012.06.005
-
Won, Jongsung / Lee, Ghang (2016): How to tell if a BIM project is successful: A goal-driven approach. Dans: Automation in Construction, v. 69 (septembre 2016).
https://doi.org/10.1016/j.autcon.2016.05.022
-
Lee, Chijoo / Lee, Ghang (2014): Feasibility of beam erection with a motorized hook-block. Dans: Automation in Construction, v. 41 (mai 2014).
https://doi.org/10.1016/j.autcon.2014.01.003
-
Uhm, Miyoung / Lee, Ghang / Jeon, Boyoung (2017): An analysis of BIM jobs and competencies based on the use of terms in the industry. Dans: Automation in Construction, v. 81 (septembre 2017).
https://doi.org/10.1016/j.autcon.2017.06.002
-
Lee, Ghang / Kim, Seonwoo (2012): Case Study of Mass Customization of Double-Curved Metal Façade Panels Using a New Hybrid Sheet Metal Processing Technique. Dans: Journal of Construction Engineering and Management, v. 138, n. 11 (novembre 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000551
-
Choi, Myungseok / Lee, Ghang (2010): Decision tree for selecting retaining wall systems based on logistic regression analysis. Dans: Automation in Construction, v. 19, n. 7 (novembre 2010).
https://doi.org/10.1016/j.autcon.2010.06.005