0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Tamari, Matan / Isaac, Shabtai (2023): Fully integrated construction planning. Dans: Automation in Construction, v. 154 (octobre 2023).

    https://doi.org/10.1016/j.autcon.2023.105027

  2. Nahum, Lior / Isaac, Shabtai / Peled, Alva / Amir, Oded (2023): Significant Material and Global Warming Potential Savings through Truss-Based Topology Optimization of Textile-Reinforced Concrete Beams. Dans: Journal of Composites for Construction, v. 27, n. 4 (août 2023).

    https://doi.org/10.1061/jccof2.cceng-4073

  3. Isaac, Shabtai / Bock, Thomas / Stoliar, Yaniv (2014): A New Approach to Building Design Modularization. Dans: Procedia Engineering, v. 85 ( 2014).

    https://doi.org/10.1016/j.proeng.2014.10.552

  4. Tuval, Eliav / Isaac, Shabtai (2022): Online Planning and Management of Design Coordination Tasks with BIM: Challenges and Opportunities. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 3 (mai 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001027

  5. Isaac, Shabtai / Shimanovich, Maxim (2021): Automated scheduling and control of mechanical and electrical works with BIM. Dans: Automation in Construction, v. 124 (avril 2021).

    https://doi.org/10.1016/j.autcon.2021.103600

  6. Katsuragawa, Clara Mariana / Lucko, Gunnar / Isaac, Shabtai / Su, Yi (2021): Fuzzy Linear and Repetitive Scheduling for Construction Projects. Dans: Journal of Construction Engineering and Management, v. 147, n. 3 (mars 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0001996

  7. Francis, Adel / García de Soto, Borja / Isaac, Shabtai (2020): Spatiotemporal Modelling for Construction Project Management. Dans: Frontiers in Built Environment, v. 6 (janvier 2020).

    https://doi.org/10.3389/fbuil.2020.608443

  8. Getuli, Vito / Capone, Pietro / Bruttini, Alessandro / Isaac, Shabtai (2020): BIM-based immersive Virtual Reality for construction workspace planning: A safety-oriented approach. Dans: Automation in Construction, v. 114 (juin 2020).

    https://doi.org/10.1016/j.autcon.2020.103160

  9. Sadeghpour, Farnaz / Isaac, Shabtai (2015): A Comparative Study of Owner, Contractor, and Consultant Perspective on the Selection Criteria for Subcontractors. Dans: Organization, Technology and Management in Construction, v. 7, n. 2 (novembre 2015).

    https://doi.org/10.5592/otmcj.2015.2.7

  10. Edrei, Tsah / Isaac, Shabtai (2017): Construction site safety control with medium-accuracy location data. Dans: Journal of Civil Engineering and Management, v. 23, n. 3 (juin 2017).

    https://doi.org/10.3846/13923730.2016.1144644

  11. Isaac, Shabtai / Su, Yi / Lucko, Gunnar / Dagan, David (2017): Work-Path Modeling and Spatial Scheduling with Singularity Functions. Dans: Journal of Computing in Civil Engineering, v. 31, n. 4 (juillet 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000650

  12. Su, Yi / Isaac, Shabtai / Lucko, Gunnar (2018): Integrated Temporal-Spatial Model for Construction Plans with Boolean Logic Operators. Dans: Journal of Construction Engineering and Management, v. 144, n. 4 (avril 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001450

  13. Isaac, Shabtai / Bock, Thomas / Stoliar, Yaniv (2016): A methodology for the optimal modularization of building design. Dans: Automation in Construction, v. 65 (mai 2016).

    https://doi.org/10.1016/j.autcon.2015.12.017

  14. Isaac, Shabtai / Edrei, Tsah (2016): A statistical model for dynamic safety risk control on construction sites. Dans: Automation in Construction, v. 63 (mars 2016).

    https://doi.org/10.1016/j.autcon.2015.12.006

  15. Isaac, Shabtai / Curreli, Mauro / Stoliar, Yaniv (2017): Work packaging with BIM. Dans: Automation in Construction, v. 83 (novembre 2017).

    https://doi.org/10.1016/j.autcon.2017.08.030

  16. Isaac, Shabtai / Navon, Ronie (2009): Modeling building projects as a basis for change control. Dans: Automation in Construction, v. 18, n. 5 (août 2009).

    https://doi.org/10.1016/j.autcon.2009.01.001

  17. Dagan, David / Isaac, Shabtai (2015): Planning safe distances between workers on construction sites. Dans: Automation in Construction, v. 50 (février 2015).

    https://doi.org/10.1016/j.autcon.2014.12.008

  18. Isaac, Shabtai / Navon, Ronie (2008): Feasibility Study of an Automated Tool for Identifying the Implications of Changes in Construction Projects. Dans: Journal of Construction Engineering and Management, v. 134, n. 2 (février 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:2(139)

  19. Isaac, Shabtai / Navon, Ronie (2013): Can project monitoring and control be fully automated?. Dans: Construction Management and Economics, v. 32, n. 6 (avril 2013).

    https://doi.org/10.1080/01446193.2013.795653

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine