- Fully integrated construction planning. In: Automation in Construction, v. 154 (Oktober 2023). (2023):
- Significant Material and Global Warming Potential Savings through Truss-Based Topology Optimization of Textile-Reinforced Concrete Beams. In: Journal of Composites for Construction, v. 27, n. 4 (August 2023). (2023):
- A New Approach to Building Design Modularization. In: Procedia Engineering, v. 85 ( 2014). (2014):
- Online Planning and Management of Design Coordination Tasks with BIM: Challenges and Opportunities. In: Journal of Management in Engineering (ASCE), v. 38, n. 3 (Mai 2022). (2022):
- Automated scheduling and control of mechanical and electrical works with BIM. In: Automation in Construction, v. 124 (April 2021). (2021):
- Fuzzy Linear and Repetitive Scheduling for Construction Projects. In: Journal of Construction Engineering and Management, v. 147, n. 3 (März 2021). (2021):
- (2020): Spatiotemporal Modelling for Construction Project Management. In: Frontiers in Built Environment, v. 6 (Januar 2020).
- BIM-based immersive Virtual Reality for construction workspace planning: A safety-oriented approach. In: Automation in Construction, v. 114 (Juni 2020). (2020):
- A Comparative Study of Owner, Contractor, and Consultant Perspective on the Selection Criteria for Subcontractors. In: Organization, Technology and Management in Construction, v. 7, n. 2 (November 2015). (2015):
- Construction site safety control with medium-accuracy location data. In: Journal of Civil Engineering and Management, v. 23, n. 3 (Juni 2017). (2017):
- Work-Path Modeling and Spatial Scheduling with Singularity Functions. In: Journal of Computing in Civil Engineering, v. 31, n. 4 (Juli 2017). (2017):
- Integrated Temporal-Spatial Model for Construction Plans with Boolean Logic Operators. In: Journal of Construction Engineering and Management, v. 144, n. 4 (April 2018). (2018):
- A methodology for the optimal modularization of building design. In: Automation in Construction, v. 65 (Mai 2016). (2016):
- A statistical model for dynamic safety risk control on construction sites. In: Automation in Construction, v. 63 (März 2016). (2016):
- Work packaging with BIM. In: Automation in Construction, v. 83 (November 2017). (2017):
- Modeling building projects as a basis for change control. In: Automation in Construction, v. 18, n. 5 (August 2009). (2009):
- Planning safe distances between workers on construction sites. In: Automation in Construction, v. 50 (Februar 2015). (2015):
- Feasibility Study of an Automated Tool for Identifying the Implications of Changes in Construction Projects. In: Journal of Construction Engineering and Management, v. 134, n. 2 (Februar 2008). (2008):
- Can project monitoring and control be fully automated?. In: Construction Management and Economics, v. 32, n. 6 (April 2013). (2013):