Fuzzy Linear and Repetitive Scheduling for Construction Projects
Auteur(s): |
Clara Mariana Katsuragawa
Gunnar Lucko Shabtai Isaac Yi Su |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, mars 2021, n. 3, v. 147 |
Page(s): | 04021002 |
DOI: | 10.1061/(asce)co.1943-7862.0001996 |
- Informations
sur cette fiche - Reference-ID
10540950 - Publié(e) le:
05.01.2021 - Modifié(e) le:
19.02.2021