0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Saeed, Fam / Mostafa, Kareem / Rausch, Christopher / Hegazy, Tarek (2023): Environmental Impact and Cost Assessment for Reusing Waste during End-of-Life Activities on Building Projects. Dans: Journal of Construction Engineering and Management, v. 149, n. 10 (octobre 2023).

    https://doi.org/10.1061/jcemd4.coeng-12943

  2. Mostafa, Kareem Tarek / Ojulari, Sayeeda / Hegazy, Tarek (2023): Enhanced Repetitive Scheduling Formulation for Meeting Deadlines and Resource Constraints in Linear and Scattered Projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 3 (1 mars 2023).

    https://doi.org/10.1139/cjce-2022-0029

  3. Hegazy, Tarek / Saad, Dina A. (2013): A microeconomic perspective on infrastructure rehabilitation. Dans: Construction Management and Economics, v. 32, n. 5 (avril 2013).

    https://doi.org/10.1080/01446193.2013.879193

  4. Bhih, Moneer / Hegazy, Tarek (2021): Enhanced Daily Windows Delay-Analysis Technique. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 3 (août 2021).

    https://doi.org/10.1061/(asce)la.1943-4170.0000475

  5. Bhih, Moneer / Hegazy, Tarek (2020): Improving Concurrency Assessment and Resolving Misconceptions about But-For Delay Analysis Technique. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 2 (mai 2020).

    https://doi.org/10.1061/(asce)la.1943-4170.0000378

  6. Rashedi, Roozbeh / Hegazy, Tarek (2016): Holistic Analysis of Infrastructure Deterioration and Rehabilitation Using System Dynamics. Dans: Journal of Infrastructure Systems, v. 22, n. 1 (mars 2016).

    https://doi.org/10.1061/(asce)is.1943-555x.0000273

  7. Hegazy, Tarek / Moselhi, Osama (1994): Estimator: a prototype of an integrated bid preparation system. Dans: Engineering, Construction and Architectural Management, v. 1, n. 1 (janvier 1994).

    https://doi.org/10.1108/eb020992

  8. Hegazy, Tarek / Abdel-Monem, Mohamed / Saad, Dina Atef (2014): Framework for enhanced progress tracking and control of linear projects. Dans: Engineering, Construction and Architectural Management, v. 21, n. 1 (janvier 2014).

    https://doi.org/10.1108/ecam-08-2012-0080

  9. Hegazy, Tarek / Mostafa, Kareem / Esnaashary Esfahani, Mansour (2020): Hands-On Class Exercise for Efficient Planning and Execution of Modular Construction. Dans: Journal of Civil Engineering Education, v. 146, n. 3 (juillet 2020).

    https://doi.org/10.1061/(asce)ei.2643-9115.0000012

  10. Hegazy, Tarek / Saad, Dina A. / Mostafa, Kareem (2020): Enhanced Repetitive-Scheduling Computation and Visualization. Dans: Journal of Construction Engineering and Management, v. 146, n. 10 (octobre 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001911

  11. Attalla, Mohamed / Hegazy, Tarek / Elbeltagi, Emad (2004): In-House Delivery of Multiple-Small Reconstruction Projects. Dans: Journal of Management in Engineering (ASCE), v. 20, n. 1 (janvier 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:1(25)

  12. Hegazy, Tarek / Elbeltagi, Emad (1999): EvoSite: Evolution-Based Model for Site Layout Planning. Dans: Journal of Computing in Civil Engineering, v. 13, n. 3 (juillet 1999).

    https://doi.org/10.1061/(asce)0887-3801(1999)13:3(198)

  13. Hegazy, Tarek / Rashedi, Roozbeh (2013): Large-Scale Asset Renewal Optimization Using Genetic Algorithms plus Segmentation. Dans: Journal of Computing in Civil Engineering, v. 27, n. 4 (juillet 2013).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000249

  14. Menesi, Wail / Golzarpoor, Behrooz / Hegazy, Tarek (2013): Fast and Near-Optimum Schedule Optimization for Large-Scale Projects. Dans: Journal of Construction Engineering and Management, v. 139, n. 9 (septembre 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000722

  15. Hegazy, Tarek / Abdel-Monem, Mohamed / Saad, Dina A. / Rashedi, Roozbeh (2013): Hands-On Exercise for Enhancing Students' Construction Management Skills. Dans: Journal of Construction Engineering and Management, v. 139, n. 9 (septembre 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000705

  16. Zaneldin, Essam / Hegazy, Tarek / Grierson, Donald (2001): Improving Design Coordination for Building Projects. II: A Collaborative System. Dans: Journal of Construction Engineering and Management, v. 127, n. 4 (août 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:4(330)

  17. Hegazy, Tarek / Zaneldin, Essam / Grierson, Donald (2001): Improving Design Coordination for Building Projects. I: Information Model. Dans: Journal of Construction Engineering and Management, v. 127, n. 4 (août 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:4(322)

  18. Mbabazi, Anania / Hegazy, Tarek / Saccomanno, Frank (2005): Modified But-For Method for Delay Analysis. Dans: Journal of Construction Engineering and Management, v. 131, n. 10 (octobre 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1142)

  19. Abdel-Monem, Mohamed / Hegazy, Tarek (2013): Enhancing Construction As-Built Documentation Using Interactive Voice Response. Dans: Journal of Construction Engineering and Management, v. 139, n. 7 (juillet 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000648

  20. Hegazy, Tarek / Menesi, Wail (2012): Heuristic Method for Satisfying Both Deadlines and Resource Constraints. Dans: Journal of Construction Engineering and Management, v. 138, n. 6 (juin 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000483

  21. Elbeltagi, Emad / Hegazy, Tarek (2001): A Hybrid AL-Based System for Site Layout Planning in Construction. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 16, n. 2 (mars 2001).

    https://doi.org/10.1111/0885-9507.00215

  22. Hegazy, Tarek / Said, Mohamed / Kassab, Moustafa (2011): Incorporating rework into construction schedule analysis. Dans: Automation in Construction, v. 20, n. 8 (décembre 2011).

    https://doi.org/10.1016/j.autcon.2011.04.006

  23. Elhakeem, Ahmed / Hegazy, Tarek (2005): Graphical Approach for Manpower Planning in Infrastructure Networks. Dans: Journal of Construction Engineering and Management, v. 131, n. 2 (février 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:2(168)

  24. Hegazy, Tarek / Elbeltagi, Emad / Zhang, Kehui (2005): Keeping Better Site Records Using Intelligent Bar Charts. Dans: Journal of Construction Engineering and Management, v. 131, n. 5 (mai 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:5(513)

  25. Hegazy, Tarek / Petzold, Kevin (2003): Genetic Optimization for Dynamic Project Control. Dans: Journal of Construction Engineering and Management, v. 129, n. 4 (août 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:4(396)

  26. Elbeltagi, Emad / Hegazy, Tarek / Grierson, Donald (2007): A modified shuffled frog-leaping optimization algorithm: applications to project management. Dans: Structure and Infrastructure Engineering, v. 3, n. 1 (mars 2007).

    https://doi.org/10.1080/15732470500254535

  27. Rashedi, Roozbeh / Hegazy, Tarek (2016): Examining budget policies for new and existing facilities: a system dynamics approach. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 6 (juin 2016).

    https://doi.org/10.1139/cjce-2015-0486

  28. Hegazy, Tarek / Menesi, Wail (2012): Enhancing the critical path segments scheduling technique for project control. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (septembre 2012).

    https://doi.org/10.1139/l2012-024

  29. Elbehairy, Hatem / Hegazy, Tarek / Soudki, Khaled (2009): Integrated Multiple-Element Bridge Management System. Dans: Journal of Bridge Engineering (ASCE), v. 14, n. 3 (mai 2009).

    https://doi.org/10.1061/(asce)1084-0702(2009)14:3(179)

  30. Abuwarda, Zinab / Hegazy, Tarek (2016): Flexible Activity Relations to Support Optimum Schedule Acceleration. Dans: Journal of Construction Engineering and Management, v. 142, n. 11 (novembre 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001193

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine