-
AliAsgari, Ramin / Fan, Chao / Li, Xinming / Golabchi, Ali / Hamzeh, Farook (2024): MOCAP and AI-Based Automated Physical Demand Analysis for Workplace Safety. Dans: Journal of Construction Engineering and Management, v. 150, n. 7 (juillet 2024).
https://doi.org/10.1061/jcemd4.coeng-13811
-
Salhab, Diana / Lindhard, Søren Munch / Hamzeh, Farook (2024): Simulation-Based Approximation of the Gain from Applying Overlapping Activities. Dans: Journal of Construction Engineering and Management, v. 150, n. 4 (avril 2024).
https://doi.org/10.1061/jcemd4.coeng-14166
-
Khalife, Salam / Pourrahimian, Elyar / Didluck, Tracey / Hamzeh, Farook: Demystifying the dynamic link between project value and design team networks: A socio-technical lean management framework. Dans: Architectural Engineering and Design Management.
https://doi.org/10.1080/17452007.2023.2283761
-
Shehab, Lynn / Al Hattab, Malak / Khalife, Salam / El Samad, Ghali / Abbas, Yara / Hamzeh, Farook (2023): Last Planner System Framework to Assess Planning Reliability in Architectural Design. Dans: Buildings, v. 13, n. 11 (26 octobre 2023).
https://doi.org/10.3390/buildings13112684
-
Barkokebas, Beda / Martinez, Pablo / Bouferguene, Ahmed / Hamzeh, Farook / Al-Hussein, Mohamed (2023): Digitalization-based process improvement and decision-making in offsite construction. Dans: Automation in Construction, v. 155 (novembre 2023).
https://doi.org/10.1016/j.autcon.2023.105052
-
Salhab, Diana / Lindhard, Søren Munch / Hamzeh, Farook: Schedule compression and emerging waste in construction: an assessment of overlapping activities. Dans: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-12-2022-1121
-
Sheikhkhoshkar, Moslem / Bril El-Haouzi, Hind / Aubry, Alexis / Hamzeh, Farook (2023): Functionality as a Key Concept for Integrated Project Planning and Scheduling Methods. Dans: Journal of Construction Engineering and Management, v. 149, n. 7 (juillet 2023).
https://doi.org/10.1061/jcemd4.coeng-13427
-
Alhussein, Hasnaa / Shehab, Lynn / Hamzeh, Farook (2022): Improvisation in Construction Planning: An Agent-Based Simulation Approach. Dans: Buildings, v. 12, n. 10 (20 septembre 2022).
https://doi.org/10.3390/buildings12101608
-
Ghanem, Malek / Hamzeh, Farook / Seppänen, Olli / Shehab, Lynn / Zankoul, Emile (2022): Pull planning versus push planning: Investigating impacts on crew performance from a location-based perspective. Dans: Frontiers in Built Environment, v. 8 (février 2022).
https://doi.org/10.3389/fbuil.2022.980023
-
Barkokebas, Beda / Al-Hussein, Mohamed / Hamzeh, Farook (2023): Assessment of Digital Twins to Reassign Multiskilled Workers in Offsite Construction Based on Lean Thinking. Dans: Journal of Construction Engineering and Management, v. 149, n. 1 (janvier 2023).
https://doi.org/10.1061/(asce)co.1943-7862.0002420
-
Ezzeddine, Ali / Shehab, Lynn / Lucko, Gunnar / Hamzeh, Farook (2022): Forecasting Construction Project Performance with Momentum Using Singularity Functions in LPS. Dans: Journal of Construction Engineering and Management, v. 148, n. 8 (août 2022).
https://doi.org/10.1061/(asce)co.1943-7862.0002320
-
Abou-Ibrahim, Hisham / Hamzeh, Farook (2022): Understanding Stakeholders' impact on design workflow dynamics using agent-based modeling. Dans: Automation in Construction, v. 138 (juin 2022).
https://doi.org/10.1016/j.autcon.2022.104254
-
Salhab, Diana / Møller, Dan Eggert / Lindhard, Søren Munch / Hamzeh, Farook / Randrup, Morten / Pilgaard, Anders (2022): Accounting for Variability: Identifying Critical Activities as a Supplement to the Critical Path. Dans: Journal of Construction Engineering and Management, v. 148, n. 5 (mai 2022).
https://doi.org/10.1061/(asce)co.1943-7862.0002266
-
Barkokebas, Beda / Khalife, Salam / Al-Hussein, Mohamed / Hamzeh, Farook (2021): A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction. Dans: Engineering, Construction and Architectural Management, v. 28, n. 8 (juillet 2021).
https://doi.org/10.1108/ecam-11-2020-0986
-
Demachkieh, Farah / Khalife, Salam / Abdul-Malak, Mohamed-Asem / Hamzeh, Farook (2020): Considerations for Filing Global Construction Claims: Legal Perspective. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 3 (août 2020).
https://doi.org/10.1061/(asce)la.1943-4170.0000393
-
Martinez, Pablo / Barkokebas, Beda / Hamzeh, Farook / Al-Hussein, Mohamed / Ahmad, Rafiq (2021): A vision-based approach for automatic progress tracking of floor paneling in offsite construction facilities. Dans: Automation in Construction, v. 125 (mai 2021).
https://doi.org/10.1016/j.autcon.2021.103620
-
Hamzeh, Farook / Abdul Ghani, Omar / Saleh Bacha, Mohammad Bassel / Abbas, Yara (2017): Modular concrete construction. The differing perspectives of designers, manufacturers, and contractors in Lebanon. Dans: Engineering, Construction and Architectural Management, v. 24, n. 6 (novembre 2017).
https://doi.org/10.1108/ecam-11-2014-0148
-
Assaad, Joseph J. / Hamzeh, Farook / Hamad, Bilal (2020): Qualitative assessment of interfacial bonding in 3D printing concrete exposed to frost attack. Dans: Case Studies in Construction Materials, v. 13 (décembre 2020).
https://doi.org/10.1016/j.cscm.2020.e00357
-
Abou Yassin, AbdAllah / Hamzeh, Farook / Al Sakka, Fatima (2020): Agent based modeling to optimize workflow of robotic steel and concrete 3D printers. Dans: Automation in Construction, v. 110 (février 2020).
https://doi.org/10.1016/j.autcon.2019.103040
-
Hamzeh, Farook / Rached, Farid / Hraoui, Youssef / Karam, Antoine Joseph / Malaeb, Zeina / El Asmar, Mounir / Abbas, Yara (2019): Integrated project delivery as an enabler for collaboration: a Middle East perspective. Dans: Built Environment Project and Asset Management, v. 9, n. 3 (juillet 2019).
https://doi.org/10.1108/bepam-05-2018-0084
-
Alves, Thaís da C. L. / Pestana, Ana Catarina V. M. F. / Gilbert, Elaine / Hamzeh, Farook (2016): Lean Principles for the Management of Construction Submittals and RFIs. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 142, n. 4 (octobre 2016).
https://doi.org/10.1061/(asce)ei.1943-5541.0000285
-
Al Hattab, Malak / Zankoul, Emile / Barakat, Mohammad / Hamzeh, Farook (2018): Crane overlap and operational flexibility: balancing utilization, duration, and safety. Dans: Construction Innovation, v. 18, n. 1 (janvier 2018).
https://doi.org/10.1108/ci-11-2016-0062
-
Abou-Ibrahim, Hisham / Hamzeh, Farook (2020): A Visual Dashboard to Monitor BIM model Dynamics. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 47, n. 2 (février 2020).
https://doi.org/10.1139/cjce-2018-0411
-
Lindhard, Søren M. / Hamzeh, Farook / González, Vicente A. / Wandahl, Søren / Ussing, Lene F. (2019): Impact of Activity Sequencing on Reducing Variability. Dans: Journal of Construction Engineering and Management, v. 145, n. 3 (mars 2019).
https://doi.org/10.1061/(asce)co.1943-7862.0001618
-
Al Hattab, Malak / Hamzeh, Farook (2015): Using social network theory and simulation to compare traditional versus BIM–lean practice for design error management. Dans: Automation in Construction, v. 52 (avril 2015).
https://doi.org/10.1016/j.autcon.2015.02.014
-
Al Hattab, Malak / Hamzeh, Farook (2018): Simulating the dynamics of social agents and information flows in BIM-based design. Dans: Automation in Construction, v. 92 (août 2018).
https://doi.org/10.1016/j.autcon.2018.03.024