0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Ko, Taewoo / Le, Chau / David Jeong, H. / Choi, Kunhee (2024): Enhancing Reliability of Construction Contingency Estimation at the Scoping Phase through Historical Cost Data Analysis. Dans: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 10, n. 4 (décembre 2024).

    https://doi.org/10.1061/ajrua6.rueng-1260

  2. Ko, Taewoo / Le, Chau / David Jeong, H. / Nguyen, Phuong / Choi, Kunhee / Gransberg, Douglas (2024): Risk Identification, Prioritization, and Mapping for Early Construction Cost Contingency in Transportation Infrastructure Projects. Dans: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 10, n. 3 (septembre 2024).

    https://doi.org/10.1061/ajrua6.rueng-1315

  3. Shamshiri, Alireza / Ryu, Kyeong Rok / Park, June Young / Choi, Kunhee (2023): Project Phase–Based Contingency Adjustment Framework for Infrastructure Renewal Projects. Dans: Journal of Construction Engineering and Management, v. 149, n. 2 (février 2023).

    https://doi.org/10.1061/jcemd4.coeng-12311

  4. Yin, Yangtian / Choi, Kunhee / Lee, Yong-Cheol / David Jeong, H. / Liu, Xin (2023): Determining the Most Economical Work Zone Lengths for Rural Highway Rehabilitation Projects. Dans: Journal of Management in Engineering (ASCE), v. 39, n. 2 (mars 2023).

    https://doi.org/10.1061/jmenea.meeng-5153

  5. Yin, Yangtian / Choi, Kunhee / David Jeong, H. / Touran, Ali (2022): Integration of Schedule, Cost, Traffic, and Risk into the Determination of Construction Contract Times. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 6 (novembre 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001089

  6. Shariatfar, Moeid / Lee, Yong-Cheol / Choi, Kunhee / Kim, Minkyum (2022): Effects of flooding on pavement performance: a machine learning-based network-level assessment. Dans: Sustainable and Resilient Infrastructure, v. 7, n. 6 (septembre 2022).

    https://doi.org/10.1080/23789689.2021.2017736

  7. Liu, Xin / Yin, Yangtian / Choi, Kunhee (2022): Economical Validation of Residential Solar Power Investment: A Cost–Benefit Analysis Approach. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 3 (mai 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001031

  8. Choi, Kunhee / Bae, Junseo / Kwak, Young Hoon (2021): OPTID: Optimal Incentives and Disincentives. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 5 (septembre 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000946

  9. Le, Chau / Wai Yaw, Meng / David Jeong, H. / Choi, Kunhee (2021): Comprehensive Evaluation of Influential Factors on Public Roadway Project Contract Time. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 5 (septembre 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000932

  10. Rew, Younho / Shi, Xijun / Choi, Kunhee / Park, Philip (2018): Structural Design and Lifecycle Assessment of Heated Pavement Using Conductive Asphalt. Dans: Journal of Infrastructure Systems, v. 24, n. 3 (septembre 2018).

    https://doi.org/10.1061/(asce)is.1943-555x.0000440

  11. Choi, Kunhee / Yin, Yangtian / Goehl, Darlene / David Jeong, H. (2021): Alternative Contracting Methods: Modeling and Assessing the Effects of Contract Type on Time-Cost-Change Performance. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 1 (janvier 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000863

  12. Choi, Kunhee / Bae, Junseo / Yin, Yangtian / Lee, Hyun Woo (2021): ACT 2 : Time–Cost Tradeoffs from Alternative Contracting Methods. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 1 (janvier 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000855

  13. Choi, Kunhee / Jung, Inwoo / Yin, Yangtian / Gurganus, Charles / David Jeong, H. (2020): Holistic Performance Evaluation of Highway Design-Build Projects. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 4 (juillet 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000781

  14. Yeon, Jaeheum / Rew, Younho / Choi, Kunhee / Kang, Julian (2020): Environmental Effects of Accelerated Pavement Repair Using 3D Printing: Life Cycle Assessment Approach. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 3 (mai 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000752

  15. Choi, Kunhee / Kim, Yoo Hyun / Bae, Junseo / Lee, Hyun Woo (2016): Determining Future Maintenance Costs of Low-Volume Highway Rehabilitation Projects for Incorporation into Life-Cycle Cost Analysis. Dans: Journal of Computing in Civil Engineering, v. 30, n. 4 (juillet 2016).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000533

  16. Choi, Kunhee / Lee, Hyun Woo (2016): Deconstructing the Construction Industry: A Spatiotemporal Clustering Approach to Profitability Modeling. Dans: Journal of Construction Engineering and Management, v. 142, n. 10 (octobre 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001165

  17. Choi, Kunhee / Lee, Hyun Woo / Bae, Junseo / Bilbo, David (2016): Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions. Dans: Journal of Construction Engineering and Management, v. 142, n. 3 (mars 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001071

  18. Choi, Kunhee / Kwak, Young Hoon / Pyeon, Jae-Ho / Son, Kiyoung (2012): Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects. Dans: Journal of Construction Engineering and Management, v. 138, n. 3 (mars 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000431

  19. Choi, Kunhee / Kwak, Young Hoon (2012): Decision support model for incentives/disincentives time–cost tradeoff. Dans: Automation in Construction, v. 21 (janvier 2012).

    https://doi.org/10.1016/j.autcon.2011.06.006

  20. Lee, Hyun Woo / Oh, Hyuntak / Kim, Youngchul / Choi, Kunhee (2015): Quantitative analysis of warnings in building information modeling (BIM). Dans: Automation in Construction, v. 51 (mars 2015).

    https://doi.org/10.1016/j.autcon.2014.12.007

  21. Lee, Hyun Woo / Choi, Kunhee / Gambatese, John A. (2014): Real Options Valuation of Phased Investments in Commercial Energy Retrofits under Building Performance Risks. Dans: Journal of Construction Engineering and Management, v. 140, n. 6 (juin 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000844

  22. Choi, Kunhee / Lee, Hyun Woo / Mao, Zhuting / Lavy, Sarel / Ryoo, Boong Yeol (2016): Environmental, Economic, and Social Implications of Highway Concrete Rehabilitation Alternatives. Dans: Journal of Construction Engineering and Management, v. 142, n. 2 (février 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001063

  23. Son, Kiyoung / Choi, Kunhee / Woods, Paul / Park, Young Jun (2012): Urban Sustainability Predictive Model Using GIS: Appraised Land Value versus LEED Sustainable Site Credits. Dans: Journal of Construction Engineering and Management, v. 138, n. 9 (septembre 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000449

  24. Choi, Kunhee / Son, Kiyoung / Woods, Paul / Park, Young Jun (2012): LEED Public Transportation Accessibility and Its Economic Implications. Dans: Journal of Construction Engineering and Management, v. 138, n. 9 (septembre 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000441

  25. Kim, Yong‐Woo / Han, Seungheon / Shin, Sungwon / Choi, Kunhee (2011): A case study of activity‐based costing in allocating rebar fabrication costs to projects. Dans: Construction Management and Economics, v. 29, n. 5 (mai 2011).

    https://doi.org/10.1080/01446193.2011.570354

  26. Choi, Kunhee / Lee, Eul‐Bum / Ibbs, C. William / Kim, Yong-Woo (2009): Multifaceted public outreach and cost–benefit analysis for its effectiveness validation. Dans: Construction Management and Economics, v. 27, n. 8 (août 2009).

    https://doi.org/10.1080/01446190903096591

  27. Hosseinian, Seyedmohammadhossein / Choi, Kunhee / Bae, Junseo (2017): IRIER: A Decision-Support Model for Optimal Energy Retrofit Investments. Dans: Journal of Construction Engineering and Management, v. 143, n. 9 (septembre 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001362

  28. Cho, Yong / Kabassi, Koudous / Pyeon, Jae-Ho / Choi, Kunhee / Wang, Chao / Norton, Terri (2013): Effectiveness Study of Methods for Removing Temporary Pavement Markings in Roadway Construction Zones. Dans: Journal of Construction Engineering and Management, v. 139, n. 3 (mars 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000608

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine