Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions
Auteur(s): |
Kunhee Choi
Hyun Woo Lee Junseo Bae David Bilbo |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, mars 2016, n. 3, v. 142 |
Page(s): | 04015085 |
DOI: | 10.1061/(asce)co.1943-7862.0001071 |
- Informations
sur cette fiche - Reference-ID
10155290 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018