A case study of activity‐based costing in allocating rebar fabrication costs to projects
Auteur(s): |
Yong‐Woo Kim
Seungheon Han Sungwon Shin Kunhee Choi |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Management and Economics, mai 2011, n. 5, v. 29 |
Page(s): | 449-461 |
DOI: | 10.1080/01446193.2011.570354 |
- Informations
sur cette fiche - Reference-ID
10207061 - Publié(e) le:
05.12.2018 - Modifié(e) le:
05.12.2018