Chul-Ki Chang
- A Case Study on Productivity Analysis and Methods Improvement for Masonry Work. Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 4 (août 2013). (2013):
- 시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임 (Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 6 (décembre 2009). (2009):
- Comparison of Efficiency and Satisfaction Level on Different Construction Management Methods for Public Construction Projects in Korea. Dans: KSCE Journal of Civil Engineering, v. 23, n. 6 (mai 2019). (2019):
- Logistic Regression Modeling to Determine Projects impacted by Schedule Compression. Dans: KSCE Journal of Civil Engineering, v. 23, n. 4 (mars 2019). (2019):
- Strategic selection of green construction products. Dans: KSCE Journal of Civil Engineering, v. 16, n. 7 (octobre 2012). (2012):
- Critical review of previous studies on labor productivity loss due to overtime. Dans: KSCE Journal of Civil Engineering, v. 21, n. 7 (mai 2017). (2017):
- Monte Carlo Simulation Approach to Support Alliance Team Selection. Dans: Journal of Construction Engineering and Management, v. 135, n. 10 (octobre 2009). (2009):
- Impact of Overmanning on Mechanical and Sheet Metal Labor Productivity. Dans: Journal of Construction Engineering and Management, v. 133, n. 1 (janvier 2007). (2007):
- Quantifying the Impact of Schedule Compression on Labor Productivity for Mechanical and Sheet Metal Contractor. Dans: Journal of Construction Engineering and Management, v. 133, n. 4 (avril 2007). (2007):
- Impact of Shift Work on Labor Productivity for Labor Intensive Contractor. Dans: Journal of Construction Engineering and Management, v. 134, n. 3 (mars 2008). (2008):