시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임 (Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader)
Auteur(s): |
Ye-Ryeong Han
Hee-Sung Park Chul-Ki Chang |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), décembre 2009, n. 6, v. 9 |
Page(s): | 105-111 |
DOI: | 10.5345/jkic.2009.9.6.105 |
- Informations
sur cette fiche - Reference-ID
10762007 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024